top of page

Gateway Upgrade

North Brisbane

Privileged to be entrusted with leading the construction of 13 bridges as part of the $1.1 billion Gateway Upgrade North project.

 

This significant project included the bridging of water - standard piling and abutment construction, two structures over live rail corridors; two demolitions over water; six existing bridge expansions; reconfiguration of interchanges, service relocation and Information Traffic Services (ITS).

​

This resulted in reduced congestion, improved travel time reliability, improved safety and ensured the accommodation of future growth.

© Celtic Tiger Services

  • Facebook - White Circle
  • LinkedIn - White Circle
bottom of page